Mandir Construction Progress

Track the journey of Shree Dham Mandir as it takes divine form.

Construction Status

Overall Completion

50%

Current Phase

Plaster Works (Main Gate & Side Plinth)

Estimated completion of this phase

Next Milestone

Complete Electrical Wiring
Coming Soon
October 2026

Temple Kalash (10 Hidden Gold Plates)

The crowning glory of the Shikhar, infused with 10 gold plates to channel cosmic energy into the temple. Cost: ₹5,50,000

June 2026

Office & Washroom Shuttering

Structural framework for the administrative office and public conveniences. Cost: ₹15,00,000

May 2026

Filling of Entire Courtyard Ground

Leveling and filling the temple courtyard to create a safe and expansive area for large gatherings. Cost: ₹20,00,000

May 2026

Darbar Gate Materials

Premium materials for the main doorway to the deity, marking the threshold between the worldly and the divine. Cost: ₹7,00,000

April 2026

Darbar (Sanctum) Decoration

Intricate and grandiose decoration for the inner sanctum where Maa Durga resides, creating an atmosphere of awe. Cost: ₹31,00,000

February 2026
Completed

Upper Dome Diameter Construction

Structural crafting of the main dome, designed to amplify the resonance of mantras and chants. Cost: ₹6,50,000

February 2026

Floor & Wall Tiles / Marble

High-quality marble and tiles that keep the temple cool, clean, and pristine for barefoot devotees. Cost: ₹15,00,000

February 2026
Completed

Main Gate Construction

A grand welcoming archway that signifies the entry into a sacred space. Cost: ₹5,51,000

February 2026

Dharamshala & Priest Room

Accommodation facilities for the resident priest and resting areas for traveling pilgrims. Cost: ₹5,00,000

February 2026

Furniture & Fixtures

Essential furniture for the priest's room and administrative areas. Cost: ₹5,00,000

February 2026

LED Screen

Large display for live telecasting of Darshan and Aarti for crowds outside the main hall. Cost: ₹4,50,000

February 2026

Darbar AC Unit

Climate control system for the sanctum to maintain a pleasant temperature for deities and devotees. Cost: ₹7,50,000

February 2026

CCTV Wiring

Security infrastructure installation to ensure the safety of the temple premises and visitors. Cost: ₹2,50,000

February 2026

Complete Plumbing System

Water supply and drainage systems for maintaining hygiene and facility operations. ₹2,50,000

February 2026

Garden Preparation

Landscaping around the temple to provide a serene, green environment for meditation. Cost: ₹2,50,000

February 2026

Parking Concrete Work

Durable concrete covering over the front drain to create organized parking space. Cost: ₹1,50,000

February 2026

Soundless Generator

Heavy-duty power backup ensuring uninterrupted Aarti and prayers without noise pollution. Cost: ₹7,50,000

November 2025

Complete Wall Concrete Work

Heavy-duty concrete reinforcement for all temple walls to ensure a structure that lasts for centuries. Cost: ₹31,00,000

September 2025
Completed

Marble Fitting on Staircases

Elegant marble installation on staircases (both sides) for a majestic entrance. Cost: ₹11,00,000

January 2025
Completed

Temple Shikhar Structure

The towering spire that serves as the beacon of faith, symbolizing the ascent of the soul to the divine. Cost: ₹8,50,000

February 2021
Completed

Foundation Construction

The deep-rooted base upon which the entire spiritual edifice rests. Cost: ₹3,00,000