Mandir Construction Progress
Track the journey of Shree Dham Mandir as it takes divine form.
Overall Completion
Current Phase
Estimated completion of this phase
Next Milestone
Temple Kalash (10 Hidden Gold Plates)
The crowning glory of the Shikhar, infused with 10 gold plates to channel cosmic energy into the temple. Cost: ₹5,50,000
Office & Washroom Shuttering
Structural framework for the administrative office and public conveniences. Cost: ₹15,00,000
Filling of Entire Courtyard Ground
Leveling and filling the temple courtyard to create a safe and expansive area for large gatherings. Cost: ₹20,00,000
Darbar Gate Materials
Premium materials for the main doorway to the deity, marking the threshold between the worldly and the divine. Cost: ₹7,00,000
Darbar (Sanctum) Decoration
Intricate and grandiose decoration for the inner sanctum where Maa Durga resides, creating an atmosphere of awe. Cost: ₹31,00,000
Upper Dome Diameter Construction
Structural crafting of the main dome, designed to amplify the resonance of mantras and chants. Cost: ₹6,50,000
Floor & Wall Tiles / Marble
High-quality marble and tiles that keep the temple cool, clean, and pristine for barefoot devotees. Cost: ₹15,00,000
Main Gate Construction
A grand welcoming archway that signifies the entry into a sacred space. Cost: ₹5,51,000
Dharamshala & Priest Room
Accommodation facilities for the resident priest and resting areas for traveling pilgrims. Cost: ₹5,00,000
Furniture & Fixtures
Essential furniture for the priest's room and administrative areas. Cost: ₹5,00,000
LED Screen
Large display for live telecasting of Darshan and Aarti for crowds outside the main hall. Cost: ₹4,50,000
Darbar AC Unit
Climate control system for the sanctum to maintain a pleasant temperature for deities and devotees. Cost: ₹7,50,000
CCTV Wiring
Security infrastructure installation to ensure the safety of the temple premises and visitors. Cost: ₹2,50,000
Complete Plumbing System
Water supply and drainage systems for maintaining hygiene and facility operations. ₹2,50,000
Garden Preparation
Landscaping around the temple to provide a serene, green environment for meditation. Cost: ₹2,50,000
Parking Concrete Work
Durable concrete covering over the front drain to create organized parking space. Cost: ₹1,50,000
Soundless Generator
Heavy-duty power backup ensuring uninterrupted Aarti and prayers without noise pollution. Cost: ₹7,50,000
Complete Wall Concrete Work
Heavy-duty concrete reinforcement for all temple walls to ensure a structure that lasts for centuries. Cost: ₹31,00,000
Marble Fitting on Staircases
Elegant marble installation on staircases (both sides) for a majestic entrance. Cost: ₹11,00,000
Temple Shikhar Structure
The towering spire that serves as the beacon of faith, symbolizing the ascent of the soul to the divine. Cost: ₹8,50,000
Foundation Construction